Installation of 160 KVAr APFC panel at Customer site.
Client:
Talegaon based Injection moulding Company with monthly bill 5 to 12 lacs per month
Steps Taken to mitigate
- APFC sizing- Custom design Panel made after correctly sizing of Plant Load.
- Manufacturing and installation
- Monitoring and Fine Tuning